40 Smart Grid Conference 2014 (SGC’14) - Grid Renovation Workshop
Illustrative DSO/DSP Use Case (Conted)
Forecast is for a hot day
Load forecast within the load pocket
is large due to lots of air
conditioners expected to be on
Feeders into the load pocket are at
expected at their capacity limit; net
load in load pocket exceeding import
capacity into the pocket by 5 MW
The ESCO bids into the DSO retail
market (at $80/MWh) to have the
DSO serve any shortfall due to
potential load pocket import
limitations (the $80/MWh is
cheaper than the cost of running
the emergency generator.)
CSP offers Aggregated DR from
within the load pocket into the ISO
market (at $60/MWh)
There is a lot of solar generation
outside the load pocket
Wholesale market prices (LMPs at
transmission substations) are
moderate ($40/MWh)
DA
ESCO Bid:
$80/MWh
Load
Pocket
DR
DR
DR
ISO
CSP Offer:
$60/MWh
DSO
LMP: $40/MWh