SGC DSP Instrukcja Użytkownika Strona 19

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 52
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 18
19 Smart Grid Conference 2014 (SGC’14) - Grid Renovation Workshop
Example: Operational Impact of Phase-Unbalanced
DR
Use Case:
Feeder Voltage: 13.8 kV
Feeder Base Load: 9 MW phase-balanced (3 MW per phase)
Participating Demand Response: 900 kW with different amounts on
each phase: 300 kW on Phase A; 100 kW on Phase B; 500 kW on
Phase C
For simplicity, assume both the base load and the DR are unity
power factor
When the 900 kW DR is deployed, the remaining load will no
longer be phase-balanced
This results in neutral current and losses for the remaining load;
thus reducing the effective DR
For a system operator, it is important to know the expected
effective DR beforehand
With 1% Neutral Losses for Remaining Load, Net Demand
Reduction: 900 - 1%*8,100 = 819 kW
Przeglądanie stron 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 51 52

Komentarze do niniejszej Instrukcji

Brak uwag